| Frame,Welding | 10 years |
| Cams | 3 year |
| Guide Rods | 3 year |
| Rotary bearing | 2 year |
| Pulleys | 2 year |
| Others | 1 year |
| Name & No. | Roman chair EC-1611 |
| Size | 1220 x 860 x 960mm |
| N.W. | 57kg |
| G. W. | 70kg |
| Package Size | 1270 x 900 x 1000mm |
| Mainframe Material | Rectangular tube 100 x50 x 3.0mm |
| Cushion | PU foam with high-grain synthetic leather |
| Flexible steel cable | Diameter of 5.8mm, PVC coated |
| Pulley | Nylon or aluminium alloy, 108mm, standard bearing inside |
| Surface treatment | Two-layer electrostatic powder coating |
| Package | Packed into plywood case |


1. Purchase department screen the suppliers of raw materials such as steel tube, pipe, plate, plastic, nylon pulley, alloy pulley, flexible steel cable, bearing, synthetic leather, PU foam cushion, and report to quality department for approval. 2. Purchase raw materials only from the qualified supplier that are checked in the quality department. 3. Quality department inspect raw materials and checked in every batch, and reject the defective part. 4. Strict processing on the drawing by modern machinery (we have drawing administration system separately). 5. Quality department inspect the semi-finished products and checked in, and dispose all the defective part. 6. Welding department weld the mainframe, and inspect and test by the quality department by drawing and standard. 7. Assembling the gym equipment, and inspect the actual performance one by one, and check in for every gym equipment. 8. Dissembling the gym equipment, and do the surface treatment, we choose two-layer electrostatic powder coating. 9. Quality department inspect the surface of every parts by inspection standard and rejected those unqualified. 10. Packed into plywood case (have separately package management rules). 11. Be put in storage (storage management system). 12. Delivery cargo of from storage and warehouse-out inspection at the same time in accordance with specific purchase order . 13. Product tracings are shifted to After-sale service department and in charge of spare parts supply.